Dali Performance Installation at a High Altitude Location

The Dali Performance installation shown in this case took place in the autumn of 2016 in Switzerland. Screw foundations were used. The wood used for the Dali tower was Swiss timber. The wind turbine was 3.5 kW machine made in Spain. The electrical connection was made by a local technician for the wind turbine to be integrated in the existing off-grid system comprising solar panels, battery storage and ground heating. Check out Lötschenpass hut installation brochure.